Construction Industry Overview (USA)
1,090
Fatalities in 2024 (21% of total)
1,075
Fatalities in 2023 (20% of total)
Source: OSHA / BLSOSHA / ASME Compliant | Factory Direct | OEM Available
Safe lifting systems, compliant construction rigging products, and dependable support for efficient projects.
1,090
Fatalities in 2024 (21% of total)
1,075
Fatalities in 2023 (20% of total)
Source: OSHA / BLS~725
Fatalities in 2024 (14% of total)
40% Struck-by falling object
20% Struck-by swinging object
Source: NIOSHA 65-year-old worker was struck and killed by a 4-ton container after chain failure.
Ideal for lifting precast concrete, steel materials, formwork, and general construction loads.
High strength alloy steel assemblies for heavy lifting applications in construction sites.
Durable connection hardware for joining slings, hooks, master links, and lifting points on construction sites.
Convert a forklift into a controlled lifting point for short, practical material handling tasks on site.
Start with sling WLL, then account for sling angle, hitch type, load edge radius, and required edge protection. For critical lifts, ask an engineer to verify the lift plan.
Standard Grade 80 chain slings lose capacity at elevated temperatures. Use the manufacturer temperature chart and choose a higher grade or special assembly when heat exposure is expected.
Operators should inspect before each use. Documented periodic inspections are also required, with alloy steel chain slings inspected at least annually under OSHA 29 CFR 1910.184.
Web slings provide a flat bearing surface and are easy to inspect. Round slings are flexible, lightweight, and useful for delicate or irregular loads.
Yes. This template can link the CTA to your quote form, engineering review process, or custom manufacturing workflow.
A 4‑ton steel beam needs to be lifted to the 8‑metre level of a new building. The crane…
6-10 min readA steel fabrication plant runs three shifts, seven days a week. Each shift lifts and positions 3‑ton beams…
6-10 min readA maintenance crew needs to lift a 1.5‑ton pump motor out of a basement pit — but the…
6-10 min readAn automotive parts plant runs three press lines producing 1200 stamped components per shift. Each line requires a…
6-10 min readGet high-quality rigging products with full compliance and professional support.